Keeping on
Well, the electrical wasn’t a huge problem. Previous owners had sheetrocked over the first outlet box in the circuit. So we cut it out, installed an outlet, and redid the sheetrock.
Since work on the workshop was paused, I made and tested 3 files this week. I’ve added the physical items to the website for sale, but I’m adding digital files to our Etsy. I’ll eventually put digital files here too, but Etsy has the views. As alway, our prices here will be lower (Etsy fees are high).
We will be painting the floor this weekend. I just want to get this workshop up and running. I want the workspace and life space separate again. Plus, I can decorate my workshop with all my file prototypes which currently get shoved into storage.